Beams placed on Escanaba River Bridge
Jordan Beck | Daily Press
Beams are placed for the U.S. 2 and 41 bridge over the Escanaba River Monday. A closure of the bridge took place Monday so this work could be done. The bridge closed at 11 a.m. and reopened at 6:30 p.m.